LATEST PROJECTS
Project | 01
Project | 02
New Alipurduar | Turturi khando forest village solar power plant | The rural electrification.
Description: An off-grid solar power plant has been set up in Turturi Khando village where electricity is
being distributed to all families and street lights.
Duration: April 2018, 30 days.
Role: project materials purchaser, and solar Technician
.
Team Size: 8
Project | 03
• Banskopa forest village solar power plant then rural electrification.
Description: Offgrid solar power plants have been installed on the rooftop of a school in Banskpa
village where electricity is being distributed to all houses and street lights.
Duration: March 2018, 25 days.
Role: Solar Technician
Team Size: 4
Project | 04
• SELCO Sambalpur Project (Odisha)
Description: Total 251 Kwp 107 Number of sites I & C.
System model –
1. Option 1A - 1kwp, 120Ah,48VDC Hybrid system. – 53 nos.
2. Option 1B - 1kwp, 150Ah,48VDC Of grid system with load wiring. – 16 nos.
3. Option 1C - 1kwp, 150Ah,48VDC Of grid system. – 13 nos.
4. Option 2A - 5kwp, 300Ah,96VDC Hybrid system. – 16 nos.
5. Option 3A - 10kwp, 200Ah,240VDC Hybrid system. – 6 nos.
6. Option 4A - 10kwp, 200Ah,240VDC Hybrid system. – 1 no.
7. Option 4B - 3kwp, 200Ah,48VDC Hybrid system. – 1 no.
8. Option 4C - 10kwp, 300Ah,240VDC,12.5kva,3Ph Hybrid system. – 1 no.
9. Option 4D,4E - 2kwp, 200Ah,48VDC Hybrid system. – 2 nos.
10. Option 4F,4G - 1kwp, 200Ah,48VDC Hybrid system. – 2 nos.
Duration: March 2022, 6 Months.
Role: Warehouse Supervisor, Service & Project Co-Ordinator.
Team Size: Contractor Based.
Project | 05
• SELCO Kalahandi Project (Odisha)
Description: Total 341 Kwp 153 Number of sites I & C.
System model –
1. Option 1 - 1kwp, 120Ah,48VDC Hybrid system. – 50 nos.
2. Option 2 - 1kwp, 150Ah,48VDC Of grid system. – 43 nos.
3. Option 3 - 1kwp, 150Ah,48VDC Of grid system with load wiring. – 19 nos.
4. Option 4 - 5kwp, 300Ah,96VDC 1Ph Hybrid system. – 28 nos.
5. Option 5 - 10kwp, 200Ah,240VDC, 15kva,3Ph, Hybrid system. – 4 nos.
6. Option 7 – 6.7kwp, 180Ah,120VDC Hybrid system. – 2 nos.
7. Option 8 - 6kwp, 200Ah,120VDC Hybrid system. – 1 no.
8. Option 11A,11B – 6.7kwp,200Ah,240VDC,12.5kva,3Ph, Hybrid system – 2 nos.
9. Option 12A - 5kwp, 150Ah,96VDC Hybrid system. – 1 no.
11. Option 12B – 3kwp, 200Ah,48VDC Hybrid system. – 1 no.
12. Option 14A – 3.3kwp, 200Ah,96VDC Hybrid system. – 1 no.
10. Option 14B - 5kwp, 300Ah,96VDC Hybrid system. – 1 no.
Duration: August 2022, 6 Months.
Role: Service & Project Co-Ordinator.
Team Size: Contractor Based.