100 kWp Ground- and Roof-Mounted Solar Photovoltaic Power Plant

Detailed Project Report - IPPL

 

1. Location: State - West Bengal; Locality - Haldia, Purba Medinipur.

​

2. Plant area: 1,500 sq. m (ground- and roof-mounted).

​

3. Plant capacity: 100.98 kWp DC (306 modules x 330 Wp) / 100 kW AC; DC:AC ratio 1.01.

​

4. PV module (WEBSOL): polycrystalline, 1,960 x 990 mm; rated power 330 Wp; module efficiency 17.0%; open-circuit voltage 46.40 V. Full electrical parameters as per OEM datasheet.

​

5. Mounting arrangement: fixed tilt; surface azimuth 0 deg (due south); tilt angle 12 deg.

​

6. Inverters: 2 x 50 kW string inverters; make ABB (now FIMER); MPPT operating window 450-820 V; maximum efficiency 98.3%; AC output 400 V nominal, 3-phase, 50 Hz.

​

7. Array configuration: 18 strings x 17 modules (9 strings per inverter).

​

8. Grid interconnection: 415 V, 3-phase, 50 Hz.

​

9. Estimated annual generation: approximately 135,000 kWh in year one; specific yield 1,337 kWh/kWp at a performance ratio of 0.77; capacity utilisation factor 15.3%. To be confirmed by PVsyst simulation.

​

10. Construction period: 15 weeks.

Project | 02

Turturi Khando Forest Village Off-Grid Solar Power Plant

New Alipurduar, Alipurduar District, West Bengal

​

Description: An off-grid solar power plant supplying every household in Turturi Khando village, together with village street lighting.

​

Duration: April 2018, 30 days.

Role: Solar Technician; project materials purchaser.

Team size: 8

Project | 03

Banskopa Forest Village Off-Grid Solar Power Plant

Rural electrification

​

Description: An off-grid solar power plant installed on the roof of the village school at Banskopa, distributing power to every household and to street lighting.

​

Duration: March 2018, 25 days.

Role: Solar Technician.

Team size: 4

Project | 04

SELCO Sambalpur Programme, Odisha

​

Multi-site off-grid and hybrid rural electrification. Total 251 kWp across 107 sites, installed and commissioned.

​

System schedule:

Option 1A - 1 kWp, 120 Ah, 48 V DC hybrid - 53 nos.

Option 1B - 1 kWp, 150 Ah, 48 V DC off-grid with load wiring - 16 nos.

Option 1C - 1 kWp, 150 Ah, 48 V DC off-grid - 13 nos.

Option 2A - 5 kWp, 300 Ah, 96 V DC hybrid - 16 nos.

Option 3A - 10 kWp, 200 Ah, 240 V DC hybrid - 6 nos.

Option 4A - 10 kWp, 200 Ah, 240 V DC hybrid - 1 no.

Option 4B - 3 kWp, 200 Ah, 48 V DC hybrid - 1 no.

Option 4C - 10 kWp, 300 Ah, 240 V DC, 12.5 kVA, 3-phase hybrid - 1 no.

Option 4D, 4E - 2 kWp, 200 Ah, 48 V DC hybrid - 2 nos.

Option 4F, 4G - 1 kWp, 200 Ah, 48 V DC hybrid - 2 nos.

​

Duration: March 2022, 6 months (concurrent with the Kalahandi programme).

Role: Warehouse Supervisor; Service and Project Coordinator.

Delivery: contractor-based teams.

 

 

 

 

 

 

 

 
Project | 05

SELCO Kalahandi Programme, Odisha

​

Multi-site off-grid and hybrid rural electrification. Total 341 kWp across 153 sites, installed and commissioned.

​

System schedule:

1 kWp, 120 Ah, 48 V DC hybrid - 50 nos.

1 kWp, 150 Ah, 48 V DC off-grid - 43 nos.

1 kWp, 150 Ah, 48 V DC off-grid with load wiring - 19 nos.

5 kWp, 300 Ah, 96 V DC, 1-phase hybrid - 28 nos.

10 kWp, 200 Ah, 240 V DC, 15 kVA, 3-phase hybrid - 4 nos.

6.7 kWp, 180 Ah, 120 V DC hybrid - 2 nos.

6.7 kWp, 200 Ah, 240 V DC, 12.5 kVA, 3-phase hybrid - 2 nos.

6 kWp, 200 Ah, 120 V DC hybrid - 1 no.

5 kWp, 300 Ah, 96 V DC hybrid - 1 no.

5 kWp, 150 Ah, 96 V DC hybrid - 1 no.

3.3 kWp, 200 Ah, 96 V DC hybrid - 1 no.

3 kWp, 200 Ah, 48 V DC hybrid - 1 no.

​

Duration: August 2022, 6 months (concurrent with the Sambalpur programme).

Role: Service and Project Coordinator.

Delivery: contractor-based teams.

To see more or discuss possible work let's talk >>

Follow me

Pabitra Belel

Solar EPC Project Manager

Domjur, Howrah

West Bengal 711405, India

Call

M: +91 9051512369   

 F: +91 7003431029

  • Telegram
  • Instagram
  • LinkedIn
  • YouTube
  • Facebook
  • Twitter
bottom of page