LATEST PROJECTS
Project | 01
Project | 02
Turturi Khando Forest Village Off-Grid Solar Power Plant
New Alipurduar, Alipurduar District, West Bengal
Description: An off-grid solar power plant supplying every household in Turturi Khando village, together with village street lighting.
Duration: April 2018, 30 days.
Role: Solar Technician; project materials purchaser.
Team size: 8
Project | 03
Banskopa Forest Village Off-Grid Solar Power Plant
Rural electrification
Description: An off-grid solar power plant installed on the roof of the village school at Banskopa, distributing power to every household and to street lighting.
Duration: March 2018, 25 days.
Role: Solar Technician.
Team size: 4
Project | 04
SELCO Sambalpur Programme, Odisha
Multi-site off-grid and hybrid rural electrification. Total 251 kWp across 107 sites, installed and commissioned.
System schedule:
Option 1A - 1 kWp, 120 Ah, 48 V DC hybrid - 53 nos.
Option 1B - 1 kWp, 150 Ah, 48 V DC off-grid with load wiring - 16 nos.
Option 1C - 1 kWp, 150 Ah, 48 V DC off-grid - 13 nos.
Option 2A - 5 kWp, 300 Ah, 96 V DC hybrid - 16 nos.
Option 3A - 10 kWp, 200 Ah, 240 V DC hybrid - 6 nos.
Option 4A - 10 kWp, 200 Ah, 240 V DC hybrid - 1 no.
Option 4B - 3 kWp, 200 Ah, 48 V DC hybrid - 1 no.
Option 4C - 10 kWp, 300 Ah, 240 V DC, 12.5 kVA, 3-phase hybrid - 1 no.
Option 4D, 4E - 2 kWp, 200 Ah, 48 V DC hybrid - 2 nos.
Option 4F, 4G - 1 kWp, 200 Ah, 48 V DC hybrid - 2 nos.
Duration: March 2022, 6 months (concurrent with the Kalahandi programme).
Role: Warehouse Supervisor; Service and Project Coordinator.
Delivery: contractor-based teams.
Project | 05
SELCO Kalahandi Programme, Odisha
Multi-site off-grid and hybrid rural electrification. Total 341 kWp across 153 sites, installed and commissioned.
System schedule:
1 kWp, 120 Ah, 48 V DC hybrid - 50 nos.
1 kWp, 150 Ah, 48 V DC off-grid - 43 nos.
1 kWp, 150 Ah, 48 V DC off-grid with load wiring - 19 nos.
5 kWp, 300 Ah, 96 V DC, 1-phase hybrid - 28 nos.
10 kWp, 200 Ah, 240 V DC, 15 kVA, 3-phase hybrid - 4 nos.
6.7 kWp, 180 Ah, 120 V DC hybrid - 2 nos.
6.7 kWp, 200 Ah, 240 V DC, 12.5 kVA, 3-phase hybrid - 2 nos.
6 kWp, 200 Ah, 120 V DC hybrid - 1 no.
5 kWp, 300 Ah, 96 V DC hybrid - 1 no.
5 kWp, 150 Ah, 96 V DC hybrid - 1 no.
3.3 kWp, 200 Ah, 96 V DC hybrid - 1 no.
3 kWp, 200 Ah, 48 V DC hybrid - 1 no.
Duration: August 2022, 6 months (concurrent with the Sambalpur programme).
Role: Service and Project Coordinator.
Delivery: contractor-based teams.